Call +91 98336 23880
Home / FAQ

Frequently asked
questions

Practical answers to common questions about scope, pricing, documentation, testing and project coordination.

Practical questions, answered directly

Things customers ask us before the first site visit.

Where do you provide project support?+
Project support is assessed against the scope, site requirements and logistics of each enquiry. The quotation confirms the applicable site-visit and travel arrangements.
What documentation do we get after the job is complete?+
Completed work can be followed by earth resistance testing using suitable calibrated instruments. Readings, electrode details and the test method are documented for the project record; any additional regulatory or inspection documentation depends on the installation and authority requirements.
How long does a typical installation take?+
Project duration depends on system scope, site access, installation conditions and the level of testing or documentation required. The expected programme is confirmed in the quotation before work begins.
What are your payment terms?+
We provide a written quotation before work begins, with scope, materials and commercial terms clearly stated. Payment terms are confirmed for each project in the quotation.
Can you handle annual testing for a system someone else installed?+
Yes. We can inspect and test existing earthing systems regardless of the original installer. Where readings or physical conditions indicate an issue, we explain the findings and the available corrective work.
Is there a minimum job size?+
We can consider single-electrode residential work, testing-only visits and larger industrial scopes. Scope, travel and commercial terms are confirmed for each enquiry.
Do you supply materials only, without installation?+
Yes. We can supply earthing and lightning-protection materials such as electrodes, GI/copper strip, earthing compound, clamps and inspection chambers. Product specification and quantity are confirmed against the project requirement.
Do you offer annual maintenance contracts (AMC)?+
Yes. An AMC can be structured around periodic resistance testing, visual/connection checks and agreed maintenance activities. The exact frequency and scope are defined in the maintenance agreement and project requirements.
How can I reach you?+
We aim to respond to enquiries during business hours. You can call +91 98336 23880 for project details, site-visit requests and quotations, or email [email protected].

New to earthing? Start here.

Short, shareable answers to the questions customers ask before a first visit.

What is earthing, in plain language?

Earthing connects specified parts of an electrical installation to earth. Protective bonding connects exposed metalwork to the protective-conductor system. Together with correctly selected protective devices, these measures help control dangerous voltages when a fault occurs. An electrode by itself is not a complete safety system.

Open the shareable customer guide →

Does fault current disappear into the ground?

No. Current flows in a complete loop back to its supply source. In a TN-S arrangement, a protective conductor provides the metallic return path. In a TT arrangement, the loop includes earth electrodes and the soil. The protective devices and required verification differ. Compare both paths in the interactive earthing guide.

Open the shareable customer guide →

A machine or tap gives a tingling shock. Is adding a rod enough?

Treat a shock or tingling sensation as a possible electrical fault. Keep people away from the affected equipment and arrange safe isolation and inspection by a qualified electrician. Do not keep touching it to test the problem. Protective-conductor continuity, bonding, insulation and protective-device operation need investigation; adding a rod alone does not prove the problem is fixed.

Open the shareable customer guide →

What is a good earth-resistance reading?

There is no single value that proves every installation is safe. The target comes from the earthing arrangement, protective devices, design, applicable requirements and project acceptance criteria. Ask for the test method, the measured system, site conditions and the stated acceptance basis, together with the reading.

Open the shareable customer guide →

What should I look for in an earth-test report?

Look for the site and electrode/system identification, date, test method, instrument identification, relevant conditions, readings, test layout or distances where needed, and the acceptance basis. Keep previous records so changes can be investigated. Ask what was tested and what was outside the agreed scope.

Open the shareable customer guide →

Should I add water or salt to get a lower reading?

A reading taken after temporary wetting can misrepresent the longer-term site conditions. Salt can accelerate corrosion and raise environmental concerns. Investigate the electrode arrangement, connections and soil conditions, and select any enhancement material against its documentation and project design. Record the test conditions.

Open the shareable customer guide →

Does an RCCB or RCD replace earthing?

No. Residual-current protection and protective earthing/bonding have different roles and must be coordinated. An RCD detects residual-current imbalance; it is not a substitute for sound protective conductors. A test button check also does not replace the installation tests needed to verify protection.

Open the shareable customer guide →

What information should I send for a useful quotation?

Send the site location, building/use type, approximate scope, available drawings or existing test records, project stage, access restrictions and any required specification. If you only know the symptoms, describe them clearly. Use the brief builder to prepare an enquiry without needing technical terminology.

Open the shareable customer guide →

What is an ESE air terminal, and is it the same as IEC 62305?

ESE means early streamer emission. ESE product claims and declared coverage depend on their stated test and design basis, for example NF C 17-102 where specified and accepted. That coverage must not be presented as an IEC 62305 rolling-sphere, mesh or protective-angle result. Confirm the required standard, authority acceptance and complete LPS design before selecting a terminal.

Open the shareable customer guide →

Do solar modules need their own separate earth pit?

Do not assume that a separate, unconnected electrode is the correct solution. PV equipment bonding, inverter instructions, electrical earthing, surge protection and any external lightning-protection system need coordination. The designer should specify connections and any separation requirements for the actual installation.

Open the shareable customer guide →